Trung Nam wind power

Overview
Total capacity: 151.95 MW, divided into 03 phases:
- – Phase 1: 39.95 MW (17 turbines, 2.35 MW)
- – Phase 2: 64MW (16 tuabin, 4 MW)
- – Phase 3: 48MW (12 tuabin, 4MW)

Trung Nam Wind Power Project was inaugurated on April 16, 2021
SMC's Mission
Transport & install of Wind turbines using 3 x 800 tons crawler cranes, 3 x 180 tons crawler cranes, 1 x 220 tons mobile cranes, 6 130 tons mobile cranes.

Installation of wind turbine blades by crawler crane 800 tons
Scale
Address
Bac Phong Commune, Thuan Bac District, Ninh Thuan Province
Total capacity
151.97 MW
Number of wind towers
45 towers