Trung Nam solar power
Overview
On November 14, 2021, in Phuoc Huu commune, Ninh Phuoc district, Ninh Thuan province, Trungnam Group held an inaugural ceremony Wind power plant project No. 5. The plant’s operation is a special milestone for The campaign completed 200 MW of wind power and 650 MW of solar power with a total capacity of 853.15 MW of Trung Nam in Ninh Thuan, contributing to bringing Ninh Thuan closer to the goal of becoming a national renewable energy center.
Trung Nam Solar Power is equipped with a 120-degree rotating rack system that automatically rotates and adjusts the direction to receive solar radiation.
SMC's Mission
- – Build DC-AC underground cable system; install solar panels.
- – Transport equipment, panel racks from the storage yard at the construction site to the construction lines of the project.
- – Transport and install equipment of inverter station.
Scale
Address
Loi Hai Commune and Bac Phong Commune, Thuan Bac District, Ninh Thuan Province
Capacity
204 MW
Power output
About 450 million kWh/year
Number of panels
700,000 panels