Load in the Goliath 700MT crane components at Hyundai Vietnam Shipbuilding

Overview

The project of load in the Goliath crane components with a weight to 2,461 MT using SPMT equipment at Hyundai Vietnam Shipbuilding.

SPMT equipment (self-propelled module transport device) is put into use in the process of load in components from vessel onto wharf and then to the final installation location.

 

SMC's mission

Using SMC’s 48 SPMT axles combined with Roll Group’s 48 SPMT
axles, a total of 96 axles and 7 PPU from Scheuerle was used. The work is carried out extremely carefully and thoroughly in each operation to ensure absolute safety.

Scale

Location
Huyndai Vietnam Shipbuilding
Weigh
2,461 MT
Equipment
SPMT Scheuerle
Number of equipments mobilized
96 axle SPMT and 7 PPU

Kinh nghiệm liên quan

Bộ đôi sà lan 14.000 tấn tham gia thay cánh dự án điện gió Đông Hải 1 - Trà Vinh
Replacing wind turbine blades at Dong Hai 1 – Tra Vinh project
See details
Thay cánh quạt điện gió
Replacing and repairing wind turbine blades of Phuong Mai wind power project – Binh Dinh
See details
Load out the Gallaf 3 oil rig components at PTSC Vung Tau port
See details
Transporting Enercon E160 wind turbine blades from Ba Son port to Dak Lak
See details
Transporting wind power equipment from Nam Van Phong port to Dak Lak
See details