Overview

Total capacity: 151.95 MW, divided into 03 phases:

  • – Phase 1: 39.95 MW (17 turbines, 2.35 MW)
  • – Phase 2: 64MW (16 tuabin, 4 MW)
  • – Phase 3: 48MW (12 tuabin, 4MW)

Trung Nam Wind Power Project was inaugurated on April 16, 2021

SMC's Mission

Transport & install of Wind turbines using 3 x 800 tons crawler cranes, 3 x 180 tons crawler cranes, 1 x 220 tons mobile cranes, 6 130 tons mobile cranes.

Installation of wind turbine blades by crawler crane 800 tons

Scale

Address
Bac Phong Commune, Thuan Bac District, Ninh Thuan Province
Total capacity
151.97 MW
Number of wind towers
45 towers

Relevant experience

Bộ đôi sà lan 14.000 tấn tham gia thay cánh dự án điện gió Đông Hải 1 - Trà Vinh
Replacing wind turbine blades at Dong Hai 1 – Tra Vinh project
See details
Thay cánh quạt điện gió
Replacing and repairing wind turbine blades of Phuong Mai wind power project – Binh Dinh
See details
Load out the Gallaf 3 oil rig components at PTSC Vung Tau port
See details
Transporting Enercon E160 wind turbine blades from Ba Son port to Dak Lak
See details
Transporting wind power equipment from Nam Van Phong port to Dak Lak
See details