Wind power No. 5 Ninh Thuan

Overview

The project of direct connection to the national grid system supplying voltage of 220kV through a 220kV transmission line with a length of 1,502 km connecting from the 220kV substation of Wind Power factory No. 5 to the 220kV Ninh Phuoc substation.
Substation with 01 3-phase transformer with capacity of 50MVA.

Wind Power Project No. 5 – Ninh Thuan

 

Close-up of wind power pylon at the project

SMC's Mission

Transport and install wind turbines using 3 800 tons crawler cranes, 3 180 tons crawler cranes, 1 220 tons mobile crane and 6 130 tons mobile cranes.

Transport blades of wind turbine by specialized MAN tractor.

 

Install the blades of wind turbine with a crawler crane.

Scale

Address
Phuoc Huu Commune, Ninh Phuoc District, Ninh Thuan Province.
Capacity
46.2 MW
Number of wind towers
11 turbine
Expected production output
136.281 MWh/year

Relevant experience

Bộ đôi sà lan 14.000 tấn tham gia thay cánh dự án điện gió Đông Hải 1 - Trà Vinh
Replacing wind turbine blades at Dong Hai 1 – Tra Vinh project
See details
Thay cánh quạt điện gió
Replacing and repairing wind turbine blades of Phuong Mai wind power project – Binh Dinh
See details
Load out the Gallaf 3 oil rig components at PTSC Vung Tau port
See details
Transporting Enercon E160 wind turbine blades from Ba Son port to Dak Lak
See details
Transporting wind power equipment from Nam Van Phong port to Dak Lak
See details