Wind power No. 5 Ninh Thuan
Overview
The project of direct connection to the national grid system supplying voltage of 220kV through a 220kV transmission line with a length of 1,502 km connecting from the 220kV substation of Wind Power factory No. 5 to the 220kV Ninh Phuoc substation.
Substation with 01 3-phase transformer with capacity of 50MVA.
SMC's Mission
Transport and install wind turbines using 3 800 tons crawler cranes, 3 180 tons crawler cranes, 1 220 tons mobile crane and 6 130 tons mobile cranes.
Scale
Address
Phuoc Huu Commune, Ninh Phuoc District, Ninh Thuan Province.
Capacity
46.2 MW
Number of wind towers
11 turbine
Expected production output
136.281 MWh/year