Load out an offshore jacket at PTSC M&C Vung Tau port

Overview

The project of load out an offshore jacket with weight 4,231.5 MT at PTSC M&C Vung Tau port by using SPMT self-propelled module.

SMC's mission

SMC cooperates with a strategic partner, the multinational corporation Sarens, to transport the offshore jacket from the fabrication area to PTSC M&C port and fix it on the barge.

Scale

Location
PTSC M&C Vung Tau port
Weigh
4,231.5 MT
Equipment
SPMT Scheuerle

Kinh nghiệm liên quan

Bộ đôi sà lan 14.000 tấn tham gia thay cánh dự án điện gió Đông Hải 1 - Trà Vinh
Replacing wind turbine blades at Dong Hai 1 – Tra Vinh project
See details
Thay cánh quạt điện gió
Replacing and repairing wind turbine blades of Phuong Mai wind power project – Binh Dinh
See details
Load out the Gallaf 3 oil rig components at PTSC Vung Tau port
See details
Transporting Enercon E160 wind turbine blades from Ba Son port to Dak Lak
See details
Transporting wind power equipment from Nam Van Phong port to Dak Lak
See details